Tibet is the world's highest ultra-high voltage power grid project.
This is the first time that power lines have been inspected independently on the snowy plateau.
Manual inspections for a day, up to one or two base towers are inspected, which is inefficient.
This is the first time that power lines have been inspected independently on the snowy plateau.
Manual inspections for a day, up to one or two base towers are inspected, which is inefficient.

After manually setting the flight route,
The flight control personnel issued an order at one time.
The drone can complete it according to the instructions.
The flight control personnel issued an order at one time.
The drone can complete it according to the instructions.
Depart independently-
Independent inspection-
Return and land independently-
Wait for the operation process.
It can be completed in just 5 minutes.
Inspection of a base tower,
More efficient than manual drone inspection,
Increased by 5 times.

Independent inspection drones can accurately detect:
Bolts, pins, nuts and other equipment,
Whether there is any shedding phenomenon.
Discover what the human eye cannot find in time.
Hidden dangers and minor defects.

This inspection was successfully filled
On the highest altitude route in the world
There is a gap in the autonomous inspection of drones
Strongly guarantee the "power system"